For wide plank installation many installers will apply waterless urethane adhesive applied in a snake like pattern on the back of each wide plank as it is installed fig 5 this will bond the planks directly to the sub floor and minimize any squeaks or movement in the future as well as limit the risk of cupping or buckling.
Installing wide hardwood.
Wide plank floor supply hardwood flooring should be installed and cared for according to nwfa guidelines that can be found here.
Solid wide plank wood flooring installation methods can vary from one manufacturer to the next but how it reacts to a gain or loss in moisture is universal.
Installing hardwood flooring is a tremendous investment for a house.
Impo a premium installation of a solid wide plank floor would include nailing and gluing.
We recommend using a nwfa certified professional for the best installation results.
Check and document moisture content of the subfloor with the appropriate moisture test.
You ll find that the installation process is a bit different from working with floors under 5 inches wide.
Additional time may be required for 5 wide or wider products as determined by moisture content.
Preventing your hardwood flooring from cupping or crowning.
How to install click lock engineered hardwood flooring easy home renovation project for beginners.
The wood subflooring must not exceed 12 13 moisture content as recommended by the hardwood manufacturer.
As to felt paper red rosin has no moisture vapor reducing properties.
Tips for installing wide plank flooring 2 1 4 planks were once the standard in residential hardwood flooring but planks that are 5 inches wide and above are popping up all over residential and commercial settings alike.
Nail down installation of wide plank solid and wide plank engineered flooring requires additional bonding to the subfloor to prevent movement and squeaks.
If you are considering installing wide plank hardwood flooring visit us at oak broad.
The installation method recommended is not a full glue down installation but only a bead of glue across the width of the board.
Manufacturer requires solid hardwood products acclimate for a minimum 72 hours prior to installation.
It can transform your space faster than almost anything else.
With wide width engineered plank hardwood you have two methods of installation.
The adhesives are expensive and it takes nearly double the labor time to glue and nail as opposed to nailing only.
A customer should expect to pay more for an installation of this type.
Think carefully about what you want the space to be and you ll wind up with the floors of your dreams.
Acclimation allows flooring to achieve equilibrium moisture content emc with the installation environment.
This is done by introducing glue to the nailing process.