The concrete slab failed a moisture test which prevents me from installing the bamboo without a moisture barrier.
Installing bamboo flooring on concrete slab.
Quality bamboo flooring costs 5 to 8 per square foot which is about the same as common hardwood flooring like oak and maple.
Installing a new floor can open up a space and turn it into an inviting area your family can enjoy.
Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
Can i install bamboo on a concrete slab.
Second there are portions of the ceiling that are already pretty low on the slab level.
Cheaper brands of bamboo flooring may contain glues the emit harmful vocs look for products that are guaranteed to emit no or very low amounts of vocs and that have been certified as sustainably harvested by the forest stewardship council fsc.
Clean the floor well with a pressure washer if it is an older concrete floor to remove any.
The glue down method can be used for solid or engineered bamboo flooring.
Also can another type of flooring be installed on top of the bamboo floor or does it need to be entirely removed.
We offer bamboo styles that can be nailed to wood subfloors glued down or floated over concrete.
Put the best flooring over concrete slabs with 50 floor.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
Yes depending on the style flooring you choose.
1 clean the slab by vacuuming away all.
The morning star or supreme bamboo tongue and groove floors and morning star click floors can be glued down to concrete on or above grade using adhesive.
Should i have been advised yo install a barrier or to consider other type of flooring for our home which is in a low lying area.
The floor was glued to the concrete slab.
If you re installing bamboo in a new home allow the slab to cure at least 60 days to reduce moisture issues in the concrete before laying the new flooring.
The two main installation methods over concrete.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
Hard to do with glue thanks.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.